Home - Products - Download - Revisions - Guidance & Info - Links - Contacts  Vis på dansk  Show in English

 

GartPlan version 1.040

General

Printout of the user’s guide. When the menu item ”Help/User’s guide” is activated the user’s guide of the program is read into either Microsoft Word or Wordpad, wherefrom the printout can be made.


In the menu item ”General/Data files/Copying with year offset” it is now possible to delimit the copy to a set of plans.

Files

A new crop graphics: ”Price analysis” has been introduced in the crop file. The graphics shows Price0 (PM=0), Price2 (PM) together with Price (Budg) as a bar chart. (Maxi)

Reports

The crop analysis by batch has been divided into 2 reports: Crop analysis by batch (PM) and Crop analysis by batch (Spec.). The 2 reports correspond to the 2 pages that were printed for each crop in the former report. Layout facilities have been introduced as well.

In the crop survey the information about which batches are selling has been included.


Under the menu item ”Control/Plan control” a new report has been introduced. The report verifies that batch placements in departments according to the plan are corresponding to the facility requirements in each phase.

In the department files period table it is possible to indicate whether a department is outdoor and whether the department has facilities such as growth light, CO2 equipment, or blackout. In addi-tion to this the batch file features the possibility on each phase line to indicate whether the batch is placed outdoors and whether Growth light, CO2, or blackout is required.

By combining this information the report verifies the consistency of requirements and facilities. If - according to the batch recipe - a certain facility is required in a phase, and this facility is not present in the department where the batch is placed - according to the planning file - then this is printed as "Error" in the report. If the opposite is the case, and a facility is not utilized then this is printed as "OBS" in the report. If the inconsistency concerns outdoor placing then this will al-ways be regarded as "Error".

Optimization

In the standard and in the cyclic optimization it is now possible to respect the cuttings balance (stock plant/consumer complexity). The facility is controlled by the checkbox “Stock plant opti-mization”. If the box is checked the calculation will ensure that the internal use of cuttings from any stock plant does not exceed the internal cuttings production.

In the ”Adjust plan batches” optimization the first selling week is now printed for each of the batches in the result report. In the standard and in the cyclic optimization the field is available in customized layouts.

Fixed errors

Department file, Periods: If a period indication was moved fully outside the original interval and the upper part of the entry was clicked a reappearing message box would lock the program.
This also applied to the selling prices in the crop file and other similar tables with interval indi-cations.

When opening the planning file an error message occurred when the file was empty.

It was not possible to clear a batch index in the planning file.

Area, Department survey: Available space in a department wasn’t calculated in weeks where the department is empty.